Soehnle Oxygen Equipment 3010 User Manual Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
English
44
Scale 1 + 2
Ground (GND)
Pressure compensation membrane on IP 65 housing
Connections
e.g. Profibus, Ethernet, etc.
Interface 2
Interface 1
Power supply
1.3 Putting into operation
Before connecting the power plug to the mains, make sure that the power supply specified on the
nameplate and the power plug version comply with local conditions.
Place the connected scales on a level and stable surface. Protect the application by selecting a site of
installation that is not subject to shocks, vibration, intensive heat or cold, draughts, chemicals or moi-
sture.
The appliance may only be opened by trained service technicians. Before carrying out any service
work on the appliance, disconnect the power supply.
After power-on, the measured values stabilise after a warm-up period of 30 minutes.
1.4 Installation
Install the weighing platform at the point of use.
Using a spirit level and the adjustable feet, ensure that the platform is
horizontal.
Install the Basic Terminal or mount it on the wall using the optional bracket.
Provide access to a mains power source or connect the appliance to a
DC power source using a DC/DC converter.
The scale is ready for use.
Ba_3010_GB.qxd 03.04.2008 17:06 Seite 4
Page view 3
1 2 3 4 5 6 7 8 9 ... 19 20

Comments to this Manuals

No comments